Thursday, February 20, 2014

Encore Series System Solves Hospital's Power Outage Problem

By monitoring the incoming and outgoing power from a UPS supplying critical power to the Cath Lab X-Ray System and using the cross triggering comparison feature, the Encore Series instrument (at the time, this instrumentation was referred to as 'Signature System') was able to pinpoint the power outage problem.

The Encore verified the interruption of the utility supply and that the UPS was doing its job, providing a "clean" supply of power to the load. However, twenty seconds passed before the emergency generator came on-line, causing downtime and confusion. The Encore data enabled the customer to determine that the X-ray Emergency Power Off switch was being incorrectly fed directly by emergency power, rather than feeding the UPS as was specified in the hospital’s power system design.

Monday, June 10, 2013

Dranetz Case Study: Broadcast Studio Loses Video in Prime Time


In late 2011, a major broadcast company had a power outage that dropped live and pre-recorded television programming for 1½ hours to approximately 1/3 of the United States during the prime time viewing period.  The company lost vital revenue while electrical and facility engineers tried to determine the source of the problem and correct it.

Problem
After several failed attempts to restore the broadcasts, it was discovered that several new pieces of equipment had been brought online shortly before the outage.  The customer was able to restore broadcasting service by turning on all equipment except these new additions.
Upon further investigation, it was discovered that several of the electrical circuits which carry the load of the broadcast equipment were close to the maximum load rating. Adding the new equipment to these circuits was enough of a load to exceed the maximum rating, which tripped the circuit breakers and took down the entire broadcast system.  A review of the remaining facility showed that many of the electrical circuits were beyond 90% of their capacity.

Solution
The broadcast company installed three Dranetz Encore Series Branch Circuit Energy Monitoring (BCEM) systems.  The system is located in their primary broadcast distribution center and has 54 Dranetz ES210 DataNode’s.  The Dranetz BCEM and ES210’s will actively monitor the real-time loading and energy consumption across all of their primary electrical distribution circuits.  The BCEM’s were incorporated into their existing Encore Series Software server for real-time monitoring, alarming, and historical reporting of the electrical usage and patterns. In addition, the customers Building Management System (BMS) is simultaneously reading the BCEM data for redundant, centralized monitoring and alarming by the 24x7 building operational staff.

The Dranetz BCEM System (below) provides the broadcast company easy, centralized monitoring of energy, demand, power factor and much more from a single monitoring location.